Zu Inhalten springen
Bar

Blackwoods Screw Dock Barbados

Von 1 Einheimischen empfohlen · Geschätzter Preis 2 von 4
Über diesen Ort
Built between 1887 and 1893 - the Bridgetown Dry Dock was built in 1887, while the actual Screw Lifting Dock started construction in 1889 and was completed in 1893. It had a lifting capacity of 1,200 tons, measuring 240ft in length with a 46ft beam and a 13ft shaft.
Unterstützt von Foursquare
Standort
Bridgetown, Saint Michael
Telefonnummer+1 246-429-7032
Sitzgelegenheiten im Freien
Ja
Unterstützt von Foursquare

Tipps von Einheimischen

Christopher John
Christopher John
January 02, 2018
The last remaining screw lift dock in the world.